03300 439 439
Specified, Supplied And Installed For The Project
TEMPORARY PUMPING SOLUTIONSMurlac provides temporary pumping solutions for reservoir drawdowns, dewatering, bypass pumping, water transfer and sediment-management projects.
Working with established specialist pump-hire partners, we can assess the duty, specify the correct equipment and coordinate delivery, installation and operation as part of the wider works.
More Than Supplying A Pump
The correct pumping arrangement depends on more than the required flow rate. Water depth, suction conditions, static head, pipeline length, elevation changes, solids content, operating period and discharge location all influence the equipment and pipework required.
Murlac reviews these factors before selecting the pump, hoses, pipework, manifolds and supporting equipment. We then work with our pump-hire partners to source suitable plant and coordinate the installation on site.
This provides the client with a complete temporary pumping arrangement rather than an unsupported equipment hire.

From Selection to Commissioning
Murlac works with a network of specialist pump-hire companies, allowing equipment to be selected from a wider fleet rather than limited to a single manufacturer or hire range.
DUTY ASSESSMENT
Flow, head and site conditions are reviewed before equipment is selected.PUMP SELECTION
Pumps and pipework are specified around the required duty.HIRE COORDINATION
Equipment, delivery and site positioning are arranged through our hire network.SITE INSTALLATION
Hoses, pipelines, valves and connections are installed on site.COMMISSIONING
The system is tested and checked before operations begin.ONGOING SUPPORT
Monitoring, standby arrangements and final removal can be managed throughout.Need A Temporary Pumping System?
DISCUSS YOUR REQUIREMENTSSend us the site location, required flow, estimated lift, pipeline distance, operating period and details of the water being pumped.
Murlac can review the duty and advise on pump selection, hire, installation, reservoir drawdown, bypass pumping and sediment-control requirements.